Projects

Static and Dynamic Testing for Greenbushes ...

CMR Technical Services worked with Belpile to perform both Static (3 tests) and Dynamic (9 PDA tests) at the Greenbushes Lithium Mine Expansion.  Measurements were taken using the Pile Driving Analyzer® and were initially evaluated on site using the Case… read more

Thermal Integrity Profiling Northlink 2 Perth

Thermal Integrity Profiling Northlink 2 Perth

Thermal Integrity Profiling

Ryobi Compile engaged CMR Technical Services to complete state of the art Thermal Integrity Profiling (TIP) and Pile Integrity Testing… read more
Pressuremeter Testing in Yallourn VIC

Pressuremeter Testing in Yallourn VIC

Pressuremeter

CMR Technical Services was engaged by Energy Australia for Federation University’s study on slope stability in brown coal in Yallourn… read more

static load testing

Forrestfield Airport Link Static Load Tests ...

In 2017-18 CMR Tech was engaged by the GFWA Trevi Joint venture to perform 3 static load tests on barrettes… read more

Exmouth Harbour Upgrade

Strain Gauging

As part of the Exmouth Harbour Upgrade a 12m pile was strain gauged at 4 levels and a 15m pile… read more